Estudio de mantenimiento basado en la confiabilidad acorde al sistema asset management aplicado a la flota de palas Bucyrus y Komatsu para la compañía minera XPC

dc.contributor.advisorZavala Fernández, José Javieres_ES
dc.contributor.authorMamani Huacasi, Leonardoes_ES
dc.contributor.authorAlvarez Garate, Kelvin Smithes_ES
dc.date.accessioned09/03/2021 14:32
dc.date.available3/9/21 14:32
dc.date.issued2020
dc.description.abstractEn este trabajo se desarrolló el tema en base a la flota de Palas P&H y Bucyrus, esta flota debido a una gran cantidad de imprevistos versus mantenciones programadas la cual tiene una confiabilidad relativamente baja, a la vez se traduce como un aumento de costos en mantención por la mayor cantidad de imprevistos, a su vez generando perdidas de producción. Este análisis lleva a fomentar un estudio para determinar la razón del escenario mencionado, en este estudio se desarrollará mediante la base de datos de la flota. El estudio de confiabilidad se basó principalmente en diagramas de Pareto y Jackknife. En primer lugar, se procedió a realizar Paretos para cada equipo obteniendo resultados muy parecidos entre equipos, donde el sistema de lubricación aparece como el sistema más crónico de la flota. Posteriormente del análisis primario de Pareto se procede a efectuar un análisis por subsistemas del sistema de lubricación para determinar la falla que afecta más la confiabilidad, estos diagramas dieron como resultado principalmente el sistema de lubricación como falla crónica y como subsistema la bomba de lubricación de grasa Open Gear, lo cual afecta directamente a la confiabilidad de la flota, por ende, a la producción de la compañía minera. Después de realizar los análisis de Pareto, corroborando la información se procede a realizar los diagramas de Jackknife para la flota completa, así también en sistemas como el de lubricación.Luego fue realizar un análisis de modos y efecto de falla determinando así un método para solucionar el problema el cual tiene como resultado implementar un mantenimiento preventivo a la falla, principalmente esta falla ocurre por condiciones operacionales, climatológicas y donde opera la máquina, lo cual no se puede mejorar de una forma razonable. 6Posteriormente de haber realizado el análisis de modos y efectos de falla se opta por realizar un análisis de Weibull el cual permitirá implementar un mantenimiento preventivo a la bomba de lubricación de grasa Open Gear en un determinado tiempo en base a la confiabilidad que opte la compañía. Los resultados obtenidos se basan en el análisis anterior, donde se obtiene los resultados para elaborar el plan de mantenimiento a seguir, el cual consiste en realizar un cambio de la bomba de lubricación de grasa Open Gear en un mantenimiento programado a las 600horas, lo que implica el cambio programados al año, estrategia que mejora notablemente la confiabilidad de la bomba de lubricación. Estos nuevos cambios serán realizados a medida que el equipo sea intervenido por mantenimientos programados de componentes mayores o por mantenciones imprevistas. En mantenimiento programados las cuales son cada 250 (Mantenimientos donde se cambia el filtro de aire programado y otros componentes menores). Estos mantenimientos imprevistos o programadas de componentes mayores serán aprovechadas para cambiar la bomba de lubricación cada 600horas aprovechando que el equipo este detenido, ahorrando tiempo y dinero, a la vez aumentar la disponibilidad del equipo.es_ES
dc.description.abstractIn this work, a topic was developed based on the Pallas P&H and Bucyrus fleet, this fleet due to a large number of contingencies versus scheduled maintenance which has a relatively low reliability, at the same time it translates as an increase in maintenance costs due to the greater number of unforeseen events, in turn generating production losses. This analysis leads to promoting a study to determine the reason for the mentioned scenario, in this study it will be developed using the fleet database. The reliability study was mainly based on Pareto and Jackknife diagrams. First, Paretos were carried out for each team, obtaining very similar results between teams, where the lubrication system appears as the most chronic system in the fleet. Subsequent to the primary Pareto analysis, a lubrication system subsystem analysis is carried out to determine the failure that most affects reliability. These diagrams mainly resulted in the lubrication system as a chronic failure and as a grease lubrication pump subsystem. Open Gear, which directly affects the reliability of the fleet, therefore, the production of the mining company. After carrying out the Pareto analyzes, corroborating the information, we proceed to make the Jackknife diagrams for the entire fleet, as well as in systems such as lubrication. Then it was to carry out an analysis of failure modes and effects, thus determining a method to solve the problem, which results in implementing preventive maintenance to the failure, mainly this failure occurs due to operational conditions, weather conditions and where the machine operates, which does not it can be reasonably improved. After having carried out the analysis of failure modes and effects, it is decided to carry out a Weibull analysis which will allow preventive maintenance to be implemented to the Open Gear grease lubrication pump in a certain time based on the reliability chosen by the company.en
dc.formatapplication/pdfes_ES
dc.identifier.citationMamani, L. y Alvarez, K. (2020). Estudio de mantenimiento basado en la confiabilidad acorde al sistema asset management aplicado a la flota de palas Bucyrus y Komatsu para la compañía minera XPC [Trabajo de investigación de bachillerato, Universidad Antonio Ruiz de Montoya]. Repositorio Institucional UARM. http://hdl.handle.net/20.500.12833/2148es_ES
dc.identifier.urihttp://hdl.handle.net/20.500.12833/2148
dc.language.isospaes_ES
dc.publisherUniversidad Antonio Ruiz de Montoyaes_ES
dc.publisher.countryPEes_ES
dc.rightsinfo:eu-repo/semantics/restrictedAccesses_ES
dc.subjectMantenimiento y reparaciónes_ES
dc.subjectMaquinariaes_ES
dc.subjectMineríaes_ES
dc.subjectIngeniería industriales_ES
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_ES
dc.titleEstudio de mantenimiento basado en la confiabilidad acorde al sistema asset management aplicado a la flota de palas Bucyrus y Komatsu para la compañía minera XPCes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.type.versioninfo:eu-repo/semantics/publishedVersiones_ES
renati.advisor.dni30960455
renati.advisor.orcidhttps://orcid.org/0000-0003-2801-1548es_ES
renati.author.dni45775667es_ES
renati.author.dni73343418es_ES
renati.discipline722026es_ES
renati.levelhttps://purl.org/pe-repo/renati/level#bachiller
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeInvestigacion
thesis.degree.disciplineIngeniería Industriales_ES
thesis.degree.grantorUniversidad Antonio Ruiz de Montoya. Facultad de Ingeniería y Gestiónes_ES
thesis.degree.nameBachiller en Ingeniería Industriales_ES
Archivos
Bloque original
Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
Mamani Huacasi, Leonardo_Alvarez Garate, Kelvin Smith_Trabajo de investigación_Bachillerato_2020.pdf
Tamaño:
114.58 KB
Formato:
Adobe Portable Document Format
Descripción: